home *** CD-ROM | disk | FTP | other *** search
/ Spec Disk 1998 Spring 4.0 / Spec Disk 1998 Spring 4.0.iso / text / 03530mmc.txt < prev    next >
Encoding:
Text File  |  1998-06-22  |  15.8 KB  |  399 lines

  1.                          SECTION 03530
  2.  
  3.                         CONCRETE TOPPING
  4.  
  5. NOTE ** This section is based on Keystone Kool Deck and
  6.         Marquee concrete topping compounds manufactured by
  7.         Mortex Manufacturing Company, Inc., with Corporate
  8.         Headquarters at the following address:
  9. NOTE **      1818 West Price Street
  10. NOTE **      Tucson AZ 85705
  11. NOTE **      Telephone 1-800-338-3225
  12. NOTE **      FAX 520-293-8884
  13. NOTE **
  14. NOTE ** Both Keystone Kool-Deck and Marquee toppings
  15.         provide traffic surfaces that stay cooler than non-
  16.         surfaced concrete for outdoor pedestrian and
  17.         vehicular traffic surfaces.
  18. NOTE **
  19. NOTE ** SECTION 03530 - CONCRETE TOPPINGS, Copyright 1996,
  20.         The Architect's Catalog, Inc.
  21.  
  22. PART 1  GENERAL
  23.  
  24. 1.1 SECTION INCLUDES
  25. NOTE ** Delete items below not required for project.
  26.  
  27.     A.  Concrete Topping Compound, Standard-Traffic Service.
  28.  
  29.     B.  Concrete Topping Compound, High-Traffic Service.
  30.  
  31.     C.  Products to Apply and Finish Concrete Toppings.
  32. NOTE ** Delete the following Article if specifying concrete
  33.         topping on existing concrete substrates.
  34.  
  35. 1.2 RELATED SECTIONS
  36.  
  37.     A.  Section 03300 - Cast-In-Place Concrete.
  38.  
  39. 1.3 REFERENCES
  40. NOTE ** Delete references from the list below that are not
  41.         actually required by the text of the edited
  42.         section.
  43.  
  44.     A.  ASTM C 109/C 109M - Standard Test Method for Compressive
  45.         Strength of Hydraulic Cement Mortars (Using 2-in. or 50-
  46.         mm Cube Specimens).
  47.  
  48.     B.  ASTM C 150 - Standard Specification for Portland Cement.
  49.  
  50.     C.  ASTM C 666 - Standard Test Method for Resistance of
  51.         Concrete to Rapid Freezing and Thawing.
  52.  
  53.     D.  ASTM C 672 - Standard Test Method for Scaling Resistance
  54.         of Concrete Surfaces Exposed to Deicing Chemicals.
  55.  
  56.     E.  ASTM C 944 - Standard Test Method for Abrasion Resistance
  57.         of Concrete or Mortar Surfaces by the Rotating-Cutter
  58.         Method.
  59.  
  60. 1.4 SYSTEM DESCRIPTION
  61.  
  62.     A.  Performance Requirements:  Concrete topping; mixed,
  63.         applied, and cured in accordance with concrete topping
  64.         compound manufacturer's printed instructions:
  65. NOTE ** Retain the following paragraph if specifying
  66.         Keystone Kool Deck topping compound.
  67.         1.  Concrete Topping, Standard-Traffic Service:
  68.             a.  Compressive strength, when tested in accordance
  69.                 with ASTM C 109; 2-inch cube specimens:
  70.                 1)  1300 pounds per square inch after 7 days
  71.                     curing time; within two standard deviations.
  72.                 2)  1800 pounds per square inch after 14 days
  73.                     curing time; within two standard deviations.
  74.                 3)  2800 pounds per square inch after 28 days
  75.                     curing time; within two standard deviations.
  76.             b.  Resistance to rapid freezing and thawing, when
  77.                 tested in accordance with ASTM C 666: Beginning
  78.                 of failure of flat areas after 70 cycles.
  79.             c.  Abrasion resistance, when tested in accordance
  80.                 with ASTM C 944:
  81.                 1)  Maximum 1 gram loss under 2 gram load, with
  82.                     50 percent flat texture.
  83.                 2)  Maximum 3 grams loss under 6 gram load, with
  84.                     50 percent flat texture.
  85. NOTE ** Retain the following paragraph if specifying
  86.         Marquee topping compound.
  87.         2.  Concrete Topping Compound, High-Traffic Service:
  88.             a.  Compressive strength, when tested in accordance
  89.                 with ASTM C 109; 2-inch cube specimens:
  90.                 1)  2100 pounds per square inch after 3 days
  91.                     curing time; within two standard deviations.
  92.                 2)  2900 pounds per square inch after 7 days
  93.                     curing time; within two standard deviations.
  94.                 3)  4000 pounds per square inch after 28 days
  95.                     curing time; within two standard deviations.
  96.             b.  Resistance to rapid freezing and thawing, when
  97.                 tested in accordance with ASTM C 666: Beginning
  98.                 of failure of flat areas after 110 cycles; no
  99.                 delamination after 300 cycles.
  100.             c.  Resistance of concrete surfaces exposed to de-
  101.                 icing chemicals, when tested in accordance with
  102.                 ASTM C 672: Beginning of failure of flat areas at
  103.                 edges after 45 cycles.
  104.             d.  Abrasion resistance, when tested in accordance
  105.                 with ASTM C 944:
  106.                 1)  Maximum 1 gram loss under 10 kilogram load,
  107.                     with 50 percent flat texture.
  108.                 2)  Maximum 3 grams loss under 20 kilogram load,
  109.                     with 50 percent flat texture.
  110.  
  111. 1.5 SUBMITTALS
  112.  
  113.     A.  Submit under provisions of Section 01300.
  114.  
  115.     B.  Product Data:  Manufacturer's descriptive literature for
  116.         concrete topping compound.
  117. NOTE ** Delete the following paragraph if specifying custom
  118.         colors or finishes.
  119.  
  120.     C.  Selection Samples:  Two sets of color chips representing
  121.         concrete topping compound manufacturer's full range of
  122.         available colors.
  123.  
  124.     D.  Verification Samples:  Two samples, minimum size 6 inches
  125.         square, representing actual color and finish of product
  126.         to be installed.
  127.  
  128.     E.  Quality Assurance Submittals:
  129.         1.  Test Reports:  Certified reports from independent
  130.             testing laboratory supporting compliance of concrete
  131.             topping to specified requirements.
  132.         2.  Manufacturer's instructions:
  133.             a.  Printed mixing and application instructions for
  134.                 each product.
  135.             b.  Manufacturer's Safety Data Sheets (M.S.D.S.) for
  136.                 each product.
  137.  
  138. 1.6 QUALITY ASSURANCE
  139.  
  140.     A.  Obtain copy of concrete topping compound manufacturer's
  141.         instructional videotape; ensure that applicator views
  142.         videotape before beginning construction activities of
  143.         this section.
  144.  
  145. 1.7 DELIVERY, STORAGE, AND HANDLING
  146.  
  147.     A.  Storage and Protection:
  148.         1.  Store products of this section in manufacturer's
  149.             unopened packaging until installation.
  150.         2.  Maintain dry, heated storage area for products of
  151.             this section until installation of products.
  152.  
  153.  
  154. PART 2  PRODUCTS
  155.  
  156. 2.1 MANUFACTURERS
  157.  
  158.     A.  Acceptable Manufacturer of Concrete Topping Compound(s):
  159.         Mortex Manufacturing Company, Inc.; Corporate
  160.         Headquarters at 1818 West Price Street, Tucson AZ 85705;
  161.         Telephone 1-800-338-3225, FAX 520-293-8884.
  162. NOTE ** Delete one of the two following paragraphs;
  163.         coordinate with Division 01 requirements.
  164.  
  165.     B.  Requests for substitutions will be considered in
  166.         accordance with provisions of Section 01600.
  167.  
  168.     C.  Substitutions:  Not permitted.
  169.  
  170. 2.2 MATERIALS
  171.  
  172.     A.  Concrete Topping Compound, Standard-Traffic Service:
  173.         1.  Acceptable Product:  Keystone Kool Deck.
  174.         2.  Characteristics:  Composed of synthetic iron-oxide
  175.             pigments and natural organic materials, meeting
  176.             performance requirements specified in SYSTEM
  177.             DESCRIPTION Article of this section.
  178. NOTE ** Determine method of color selection; retain one of
  179.         following three paragraphs.  Coordinate selection
  180.         method with requirements for Samples in SUBMITTALS
  181.         Article of Part 1.  If more than one color
  182.         required, retain third paragraph below and
  183.         coordinate with SCHEDULES Article of Part 3.
  184.         3.  Color:  Selected from full range of manufacturer's
  185.             standard colors.
  186.         4.  Color:  _________________.
  187.         5.  Color:  Specified in SCHEDULES Article of this
  188.             section.
  189.  
  190.     B.  Concrete Topping Compound, High-Traffic Service:
  191.         1.  Acceptable Product:  Marquee.
  192.         2.  Characteristics:  Composed of synthetic iron-oxide
  193.             pigments, Portland cement, limestone, crystalline
  194.             quartz, and natural organic materials; meeting
  195.             performance requirements specified in SYSTEM
  196.             DESCRIPTION Article of this section.
  197. NOTE ** Determine method of color selection; retain one of
  198.         following three paragraphs.  Coordinate selection
  199.         method with requirements for Samples in SUBMITTALS
  200.         Article of Part 1.  If more than one color
  201.         required, retain third paragraph below and
  202.         coordinate with SCHEDULES Article of Part 3.
  203.         3.  Color:  Selected from full range of manufacturer's
  204.             standard colors.
  205.         4.  Color:  _________________.
  206.         5.  Color:  Specified in SCHEDULES Article of this
  207.             section.
  208. NOTE ** Retain the following paragraph if specifying
  209.         Marquee topping.
  210.  
  211.     C.  Concrete Curing Compound:
  212.         1.  Acceptable Product:  Mor-Cure.
  213.         2.  Characteristics:  Liquid curing compound supplied by
  214.             manufacturer of concrete topping compound for use
  215.             with high-traffic service concrete topping compound;
  216.             water-soluble, self-dissipating.
  217. NOTE ** Retain the following two paragraphs if specifying
  218.         Kool-Deck topping; delete both if specifying
  219.         Marquee topping.
  220.  
  221.     D.  Portland Cement:  ASTM C 150, Type I; white color.
  222.  
  223.     E.  Sand:  Ground marble composition, passing size number 20
  224.         sieve.
  225.  
  226.     F.  Water:  Clean, potable; containing no contaminants which
  227.         would impair appearance or performance of products in
  228.         this section.
  229. NOTE ** Retain the following paragraph if specifying
  230.         application of topping over existing concrete
  231.         substrate.
  232.  
  233.     G.  Bonding System:
  234.         1.  Acceptable Product:  Mortex PTA System.
  235.         2.  Characteristics:  Materials for bonding concrete
  236.             topping mix to existing concrete substrates supplied
  237.             by manufacturer of concrete topping compound.
  238.  
  239. 2.3 MIXES
  240.  
  241.     A.  Proportion concrete topping materials in accordance with
  242.         concrete topping compound manufacturer's instructions;
  243.         addition of materials other than those specified therein
  244.         is not permitted.
  245.  
  246.     B.  For application at temperatures below 45 degrees F, use
  247.         hot water in concrete topping mix; for application at
  248.         temperatures above 90 degrees F, or application under
  249.         windy conditions, use ice water in concrete topping mix.
  250.  
  251.     C.  Mix concrete topping materials in paddle-type plaster
  252.         mixer in accordance with procedures specified in concrete
  253.         topping compound manufacturer's instructions; add
  254.         materials in specified order, maintaining specified
  255.         mixing periods.
  256.  
  257.     D.  Test concrete topping mix prior to application, using
  258.         viscosity cup supplied by concrete topping compound
  259.         manufacturer; adjust mix, if required, to specified
  260.         consistency in accordance with concrete topping compound
  261.         manufacturer's instructions.
  262.  
  263.  
  264. PART 3  EXECUTION
  265.  
  266. 3.1 EXAMINATION
  267.  
  268.     A.  Verification of Conditions:  Test concrete substrate for
  269.         correct condition of substrate for application of
  270.         concrete topping.
  271.  
  272. 3.2 PREPARATION
  273.  
  274.     A.  Protection of Adjacent Surfaces:  Mask off adjacent
  275.         surfaces to protect from corrosion by concrete topping
  276.         mix.
  277. NOTE ** Retain one of the following two paragraphs; first
  278.         paragraph applies to new concrete substrates;
  279.         second paragraph applies to application of topping
  280.         over existing concrete substrates.
  281.  
  282.     B.  Surface Preparation:  Scarify concrete substrates to
  283.         receive concrete topping, using nylon-bristle push broom
  284.         immediately before application of concrete topping;
  285.         scarify with single broom pass only, to avoid sweeping
  286.         loose sand to surface of concrete substrate.
  287.  
  288.     C.  Surface Preparation:  Prepare existing concrete
  289.         substrates to receive concrete topping, using specified
  290.         bonding system in accordance with manufacturer's
  291.         instructions.
  292.  
  293. 3.3 APPLICATION
  294. NOTE ** Coordinate requirements of Section 03300 with the
  295.         following recommendations from the manufacturer:
  296. NOTE **
  297. NOTE ** Concrete containing no admixtures is preferred;
  298.         however, the following are acceptable:
  299. NOTE **
  300. NOTE **      Air-entraining admixtures:    Master Builders
  301.         Micro-Air; W.R.Grace DAREX II AEA
  302. NOTE **      Water Reducing Admixtures:    Naphthalene or
  303.         Melamine based super plasticizers.
  304. NOTE **      Reinforcing Fibers: Non-ferrous composition
  305.         only.
  306. NOTE **
  307. NOTE ** Admixtures containing the following are not
  308.         acceptable:
  309. NOTE **
  310. NOTE **      Lignosulfate.
  311. NOTE **      Vinsol resin.
  312. NOTE **      Calcium chloride or chloride ions.
  313. NOTE **
  314. NOTE ** Contact manufacturer for acceptability of other
  315.         admixtures.
  316. NOTE **
  317. NOTE ** Delete the following two paragraphs if specifying
  318.         topping over existing substrates.
  319.  
  320.     A.  Installation of concrete substrate is specified in
  321.         Section 03300.
  322.  
  323.     B.  Apply concrete topping mix to concrete substrate when
  324.         substrate surface shows water rise, but no deep
  325.         depression, when walked on.
  326.  
  327.     C.  Apply concrete topping mix in two applications in
  328.         accordance with concrete topping compound manufacturer's
  329.         instructions, using one of the following:
  330.         1.  Brush, supplied by concrete topping compound
  331.             manufacturer.
  332.         2.  Sprayer, type recommended by concrete topping
  333.             compound manufacturer.
  334.         3.  Stucco texture machine.
  335.  
  336.     D.  Maintain coverage of 300 square feet per unit of concrete
  337.         topping compound mixed.
  338.  
  339.     E.  Trowel concrete topping mix, using trowel supplied by
  340.         concrete topping compound manufacturer; perform
  341.         trowelling in accordance with concrete topping compound
  342.         manufacturer's instructions to achieve specified pattern,
  343.         color uniformity, and levelness.
  344.  
  345.     F.  Nominal thickness of concrete topping application:  1/8
  346.         inch.
  347. NOTE ** Retain the following paragraph if specifying
  348.         Marquee topping.
  349.  
  350.     G.  Apply specified concrete curing compound to finished high-
  351.         traffic service concrete topping surfaces, using
  352.         construction sprayer; ensure complete uniform coverage of
  353.         surfaces.
  354.  
  355. 3.4 CLEANING
  356.  
  357.     A.  Remove masking from adjacent surfaces.
  358.  
  359. 3.5 PROTECTION OF INSTALLED PRODUCTS
  360.  
  361.     A.  Protect finished concrete topping surfaces during initial
  362.         72 hours of curing from frost and other inclement weather
  363.         in accordance with concrete topping compound
  364.         manufacturer's instructions.
  365.  
  366.     B.  Protect finished concrete topping surfaces during initial
  367.         12 hours of curing from rain by covering surfaces if rain
  368.         is predicted; if covering surfaces with plastic film,
  369.         remove film as soon as probability of rain, or initial 12
  370.         hour period, has ended to prevent non-uniform curing of
  371.         concrete topping.
  372.  
  373.     C.  Allow no traffic on concrete topping for a period of 48
  374.         hours after completing trowelling.
  375.  
  376.     D.  Allow only light foot traffic on concrete topping for a
  377.         period of 14 days after initial 48 hour curing period.
  378.  
  379.     E.  Using locations where concrete topping has been applied
  380.         for storing or placing waste containers, storage
  381.         containers, or construction materials is not permitted.
  382. NOTE ** The following Article will assist in specifying
  383.         more than one color or type surfacing; delete if
  384.         not required.
  385.  
  386. 3.6 SCHEDULES
  387.  
  388.     A.  Pool Area:  Standard-traffic service concrete topping;
  389.         _______ color.
  390.  
  391.     B.  Patio Area: High-traffic service concrete topping;
  392.         ________ color.
  393.  
  394.     C.  Walkways:   High-traffic service concrete topping;
  395.         ________ color.
  396.  
  397.  
  398.                          END OF SECTION
  399.